Most building problems are project management problems. The roof frame that went up while the engineer’s report was still being reviewed. The tiler who arrived before the waterproofing was inspected. The variation that appeared mid-build because the scope wasn’t properly defined upfront. These aren’t unusual stories. They’re the predictable result of a build that wasn’t properly managed from the start.
Project management in construction covers a lot of ground. On a typical residential project, this includes:
There’s a meaningful difference between a builder who manages their own projects and one who hands a contract to a site supervisor and steps back. When the person managing your project is also the licensed builder responsible for the quality of the work, the incentives are aligned in a way they simply aren’t when project management is delegated.
Emanuel is on every project. He’s the one who has seen the drawings, agreed the scope, engaged the trades, and is responsible for the outcome. When something needs a decision, the person making it understands the full context of your project.
Our project management covers the full lifecycle of a build, starting in the pre-contract phase where design, planning, engineering, and approvals are coordinated before any construction begins. This is where most projects that later go wrong are already in trouble, because the pre-construction work wasn’t thorough enough to catch what was coming.
By the time construction starts on a Sarmis Building Group project, the programme is set, the trades are engaged, the approvals are in place, and there are no significant unknowns. That’s not an accident. It’s the result of doing the pre-construction phase properly.
Get in touch and we’ll walk you through the next steps.
0422 624 998
info@sarmisconstruction.com.au
Fursden Road, Carina
ABN: 31 168 959 975
Monday – Friday
8am to 4pm
Saturday
By appointment only
Sunday
Closed
"*" indicates required fields